Today we filmed the scenes that take place in the bedroom, having already gained permission from the home owner to use the facility.
Friday, 23 October 2015
Call sheet for 23/10/15
This is the call sheet for today's shoot in the location of the bedroom. We filmed all of the scenes from this location, including the over-head shot of Lyle and Ashaana talking on the bed. This shoot went exceptionally well because, we were not outside so outside noise could not interfere. On the other hand the lighting gave a yellow tint to the clips. There was no break as the shoot was under an hour.
Monday, 19 October 2015
(TASK 7) Editing
Today, we edited the lip synch footage using Final Cut Pro. For example, we edited quite a few of the clips by shortening them so that we could appropriately place it in the right positions. We also added an effect on two of the lip syncing shots - we placed them together and reduced the opaqueness of one of the shots, so that they faded together.
Friday, 16 October 2015
Researching and Planning the Moving Image Work
I completed an evaluation, comparing my AS journey regarding elements such as logistics and planning, with my A2 journey so far. I have used the creative technology of Prezi and please view the presentation, which is embedded in this blog post.
(TASK 6) Shooting the video
Today we used the Television Studio in college, in order to film the lip syncing. Originally, whilst planning at the very start of our project, we were going to make our actress lip synch in the parks, forests and natural settings we used. However, we felt as if it would be more professional to film the lip synching in the studio. I think that shooting lip synching only works for some songs, and we felt that for our narrative based video it would be too corny.
This was a good session of shooting, as we were able to complete all the recorded lip synch shots. There was also useful pieces of technology to aid us, such as a laptop and television to play the song and show our actor the lyrics.
This was a good session of shooting, as we were able to complete all the recorded lip synch shots. There was also useful pieces of technology to aid us, such as a laptop and television to play the song and show our actor the lyrics.
Call sheet for 16/10/15
This is the call shoot for today's shoot (16th October, 2015). We shot a large element of the music video today, as we were shooting the lip-synch scenes. The cast was Ashaana Bheir and the crew was Lyle Barrett and Courtney Carr (me). We shot these scenes in the TV studio, and in terms of costuming, Ashaana wore a white jumper and silver jewellery. Her hair was tied up so that the focal point could be her face, which would be especially useful when shooting medium-close ups and close-ups.
Thursday, 15 October 2015
Team Meeting
We have decided to not use the table templates that we used for our other team meetings, because as we progress, the team meeting becomes more detailed. It is easier and neater to type up the minutes
straight onto our blogger, but we also have a copy in Word. Although we met yesterday, we felt it was necessary to meet today, as we are filming tomorrow.
Team Meeting :15/10/2015
Attendees: Lyle Barrett and Courtney D. Carr
Time of start: 10.43 am
Time of end: 11.40 am
Agenda:
- We have called this meeting to discuss our progress so far and what we have left to do.
SUBJECTS DISCUSSED:
straight onto our blogger, but we also have a copy in Word. Although we met yesterday, we felt it was necessary to meet today, as we are filming tomorrow.
Team Meeting :15/10/2015
Attendees: Lyle Barrett and Courtney D. Carr
Time of start: 10.43 am
Time of end: 11.40 am
Agenda:
- We have called this meeting to discuss our progress so far and what we have left to do.
SUBJECTS DISCUSSED:
- We have discussed our progress so far. We have made good progress with filming but we realise that we have a lot to do in order to meet the deadline. We have decided to complete the goal of filming the rest of our footage by filming for extra days during the half term holiday.
- Availability and commitment: We have had some problems with commitment from the supporting parties, and in order to solve this we have revised our filming schedule so that everyone can be available. We have also compared college time tables so that we can shoot in our breaks, if possible.
- We also discussed the issue of the weather changing. Late Autumn is approaching and the clocks are due to go back on the 26th October 2015. This means it will get darker quicker. In order to resolve this issue, we have decided to film our narrative inside instead of outside because of our availability. Furthermore, we have decided to book the Television Studio in college, in order to shoot the lip syncing. We have decided to not film in the outside locations as originally planned, because we felt that it would look better filmed in a closed room. We also want the lip syncing to be in black and white, so we plan to set the camera to the monochrome setting, so that when we edit we do not have to use final Cut Pro to alter the colour appearance.
Wednesday, 14 October 2015
Team meeting
Lyle and I are continuously meeting to discuss our progress. Today we met to discuss where we are now. We have not stuck to our original dates on our call sheet, but it has taught us to be more flexible and given that we have at least two more weeks.
A brief outline of what we discussed are as followed:
- Our progress so far
- What we have left to film
- A change of plan (changing the planned order of the shoots)
Please refer to the table below to see more details.
A brief outline of what we discussed are as followed:
- Our progress so far
- What we have left to film
- A change of plan (changing the planned order of the shoots)
Please refer to the table below to see more details.
Tuesday, 13 October 2015
(TASK 7) Editing the Video
Today, Lyle and I continued to edit and we made an important decision. We discovered that the footage that we filmed in the park was too dark, and we have a lack of time to re-film this particular section. Rather than let it set us back, we have decided to re-film the original outside narrative scenes in the cafe instead. This is because the lighting is much better, as seen as below. This setting is also not as restrictive - with artificial lighting we are able to film for longer hours. The narrative scenes in the cafe look much better as well.
Monday, 12 October 2015
Call sheet for 12/10/15
This is the call sheet for today's shoot in Café brunch on Wanstead High street. We shot the beginning narrative scenes and the ending narrative scenes. Today's shoot was difficult because we hadn't scripted the speech, so we had to do a lot of re-takes due to mistakes. However we were able to film the majority of what we had planned.
(TASK 6) Shooting the video
Today Lyle and I filmed in one of our locations. I am the director of the music video as Lyle is one of the actors, but he is one of the producers along with myself. As you can see in the figures below, Lyle set up the camera today and adjusted the settings. We used manual focus but found that some of our footage was out of focus, especially the narrative scene. However this added to the whole effect of the scene, as Lyle is meant to appear distant during the narrative scenes. The slight lack of focus on his face really brings this across to the audience.. In these scenes Ashaana, who plays the main girl, pours out her heart to Lyle, my partner in this project and the actor who plays the main guy. We filmed the narrative scenes of our video as planned in our discussions as a team.
Friday, 9 October 2015
(TASK 7) Editing
Today we edited the footage we filmed in the park. This location was brilliant to use as there are a lot of open spaces and this reduces the risk of lighting becoming an issue. It was also quite empty given the day, time of day, and cold season - where most people were at school, home or work. Therefore we did not have the issue of disturbing the general public.
Positives: We were able to film some of our required shots and we were able to make progress by beginning the editing process. The first photograph shows Lyle and I editing the beginning of our music video. We were picking which establishing shot to use at the beginning of our video, as we filmed two different versions.
Negatives: I felt as if we could have carried out even more filming during the time we were at the location. I believe we were slower because we need still need to improve our technical skills, but more so our time management skills. We will revise this issue in our subsequent team meeting. My suggestion is that we organise our time better.
Thursday, 8 October 2015
Call sheet for 8/10/15
This is the call sheet for today's shoot.
(TASK 6) Shooting the video
Today we filmed in the location of Alexandra Palace and Park. This day was successful as we filmed the bulk of our narrative scenes. Those present were myself, Lyle, Demi and Ashaana. The only negative aspect was that, due to the season, it got dark quite quickly. This limited the amount of time we could spend filming. However it was isolated so we didn't disturb the public.
Tuesday, 6 October 2015
Call sheet for 6/10/2015
We completed a call sheet after filming today, to formally outline the successes and failures of the day. We used the same template that we used to create the overall call sheet for all our proposed filming dates. Today was a successful day of filming and we wanted to document our progress.
(TASK 6) Shooting the Video
Today I began filming for our music video. As I am the director and person in charge of the camera, I used my creative vision to try out different shots. Firstly, we filmed scene 8 - the piggy back scene. I tried a long shot at first because that is one of the original ideas that we had. However for an intimate scene , the camera angle and shot type seemed distant. I then switched to a handheld camera and used an extreme close up. This translated better on camera and created an intimate atmosphere.
Monday, 5 October 2015
(TASK 5) Request to use copyright
In the music industry, individuals have to seek copyright permission from the owner of the music track that they would like to use. This is an example of me doing so, asking Tori Kelly's label 'Capitol Records' for permission to use her song 'All in my head.'
(TASK 5) Team Meeting
Lyle and I decided to meet today to finalise our plans. We discusses the topics of sexual elements, Lyle acting, availability and the overall plan. Please find more details below:
(TASK 5) Pre-production Recce
Lyle and I created a Recce - a document showing pictures of our locations with annotated details regarding the positive aspects of using the location, and the risk factors. We used the software of Prezi and please find the presentation below:
(TASK 5) Pre-production talent and location release
We want all our actors to have full acknowledgement of our plans and details regarding the music video. Therefore we asked them to sign an agreement. Also we are using Lyle's bedroom so we wanted to get the homeowner's permission:
(TASK 5) Pre-production Risk assessments
We completed risk assessments for the locations for the bedroom we are using, the park, the street and cafe. Please find it enclosed below:
Friday, 2 October 2015
(TASK 5) Pre-production storyboard
Today Lyle and I finished our storyboard, completing three pages. We are satisfies with our work and I think that having a storyboard will guide us. We annotated the storyboard in detail in terms of mise-en-scene, camera, lighting etc.
Thursday, 1 October 2015
Subscribe to:
Posts (Atom)